1.
Crane
Single -bridge ceiling crane: This type of crane is made up of a horizontal bridge that moves on two parallel rails. Single -bridge ceiling cranes are suitable for moving light to medium loads.
Ceiling crane of two bridges: This type of crane consists of two horizontal bridges that move on four parallel rails. Crane cranes of the two bridges are suitable for moving heavy and bulky loads.
Arm Crane: This type of crane consists of a moving arm mounted on a fixed column. The arm cranes are suitable for moving times in a circular area.
Gate crane: This type of crane is made up of a horizontal bridge on two moving pedestals. Gate cranes are suitable for moving times in open spaces
pendant crane: This type of crane is attached to the structure of the structure and does not require a column or rail. Pendant cranes are suitable for moving light loads in limited spaces.
Steps
Design: At this stage, according to customer needs and specifications, crane technical and computational maps are designed. At this point, factors such as cargo capacity, crane crane, lift height, motion speed and type of user are considered.
Preparation of raw materials: After design, the raw materials required for crane are prepared. These materials include steel, electrical components, motors, gearboxes and other standard parts.
cut and welding: At this stage, steel parts are based on technical maps and welding. Welding should be done by skilled and appropriate equipment to ensure the strength and safety of the crane.
assembly: After welding, different parts of the crane are assembled. At this point, electrical components, engines, gearboxes and other standard parts are also installed.
Color: After assembly, the crane is stained. Painting in addition to beauty, protects the metal components from corrosion and rust.
Testing and Inspection: After staining, the crane is tested and inspected. At this stage, the crane function is checked in different loading conditions and ensures its safety and efficiency.
Shipping: After testing and inspection, the crane is shipped to the installation site. Shipping should be done carefully and with appropriate equipment to prevent damage to the crane.
Conclusion
Ceiling cranes as one of the main equipment in various industries play an important role in increasing productivity and reducing risks. Kara Kayhan Akhtar Structures is recognized as one of the best options for the construction and installation of ceiling cranes in Tehran by providing quality and affordable services.